Refocused on other areas. Got the west bedroom closet (through which the hot air ducts run) ready for drywall. Almost completed electrical work in the garage. (Since the power lines to the garage do not have a ground wire, we're sinking a rod into the ground and running the wire to it.)
As I left for MacKenzie's tennis match, Mark was pulling nails from the kitchen walls and getting it ready for drywall.
No comments:
Post a Comment